Garage-to-ADU Conversion in Woodland Hills

Woodland Hills, CA |

NE Construction & Design turned an existing Woodland Hills garage into an accessory dwelling unit in four months. The finished photos show a full kitchen and the hallway that connects the interior spaces.

Finished kitchen in a Woodland Hills garage conversion ADU
  • Completed Date

  • Project Budget

    Not disclosed
  • Project Duration

    4 months
  • Conversion of an existing garage into an accessory dwelling unit

    Project Challenges

    The existing garage sets the outside dimensions. Within that footprint, room layout has to account for door swings, appliance clearances and usable routes from one room to the next.

    Objectives

    Make the existing structure useful as living space with room to prep meals, store kitchen essentials and move comfortably between rooms.

    Results

    The result is a finished ADU with a dedicated full kitchen and a clear route through the interior. Compare it with the separate-bedroom layout in the North Hollywood conversion.

    Planning a similar project? Talk with NE Construction & Design about your property or explore more completed work.

    Compare detached builds and garage conversions on our Los Angeles ADU construction page.

    Solutions & Strategy

    The completed kitchen shows the sink, appliances, storage and work surfaces together. A second photo shows the finished hallway and continuous flooring between adjoining spaces. Those two views show how the kitchen and circulation work together within the conversion.