Projects
Over 1,000 completed projects.
Proudly serving our industry for over 30+ years with showcased work and clients that we are proud of.
Balcony Reinforcement and Repairs for SB 326 & SB 721 Requirements in Los Angeles
Project Budget: Starting at $4,000
Los Angeles | March 13, 2026
NE Construction completed structural reinforcement, waterproofing, and exterior repairs for multiple elevated balconies at a multifamily residential property in Los Angeles. The work was performed following balcony inspection findings associated with California SB 326 and SB 721 requirements. The project involved temporarily supporting the affected areas, reinforcing structural support components, repairing deteriorated balcony surfaces, restoring the exterior stucco, and applying a durable waterproof deck coating. Careful planning allowed the repairs to be completed in approximately two weeks while minimizing disruption to the property and its residents.

High-Ceiling New Construction ADU in Santa Monica
Project Budget: $60,000
Santa Monica | June 5, 2026
NE Construction completed the ground-up construction of a new detached Accessory Dwelling Unit in Santa Monica, California. Designed with high ceilings and a modern sloped roofline, the new ADU creates a bright, open living environment while making efficient use of the available backyard space. The project progressed from foundation preparation and structural framing through roofing, weatherproofing, window and door installation, and exterior finishing. NE Construction carefully coordinated each stage of construction to deliver a durable, attractive, and functional addition to the property within an approximately four-month construction period.

New Foundation for ADU Garage Conversion in East Los Angeles
Project Budget: $28,000
East Los Angeles, CA | December 27, 2024
NE Construction was hired to lay the foundation for a 2-car garage conversion into an ADU in East Los Angeles. The homeowner required a durable, high-quality foundation to serve as the base for the ADU, ensuring structural integrity and compliance with local building regulations. The project needed to be completed efficiently to allow the main construction to move forward on schedule.

New Carport Construction in West Hollywood
Project Budget: $45,000
West Hollywood, CA | September 6, 2024
NE Construction was engaged by a client in West Hollywood to build a durable and modern carport that would provide protection for vehicles while adding value to the property. The project required the construction of a new foundation, installation of structural steel beams, and a roof designed to complement the overall property.

New Foundation and Framing for ADU in Inglewood by NE Construction
Project Budget: $15,000
Inglewood, CA | September 1, 2024
NE Construction was commissioned to lay the foundation and framing for a new ADU in Inglewood, CA. The homeowner needed a solid and reliable structure to serve as the base for a fully functional ADU. The project’s goal was to establish a strong foundation and framework while adhering to the budget and timeline.

Foundation Repair in Pacific Palisades
Project Budget: $18,000
Pacific Palisades, CA | August 6, 2024
NE Construction was engaged by a homeowner in Pacific Palisades to address significant foundation issues affecting the structural integrity of their home. The goal was to stabilize the foundation and prevent further damage, ensuring the property’s safety and longevity.

New Footing and Slab at Matteson Ave by NE Construction
Project Budget: $18,000
Los Angeles | May 30, 2024
NE Construction was contracted to address foundation concerns at a property on Matteson Ave, Los Angeles. The project involved the installation of a new footing and slab to enhance the structural integrity of the building.

NE Construction Thousand Oaks Foundation Repair Job
Project Budget: $15,000
Thousand Oaks, CA | May 17, 2024
A homeowner in Thousand Oaks contacted NE Construction to address emerging foundation issues that threatened the stability of their home. The problems included minor cracks and settling that required prompt and effective repair to prevent further damage.

Expert Foundation Repair in Beverly Hills
Project Budget: $108,000
Beverly Hills, CA | April 10, 2024
NE Construction was approached by a homeowner facing significant foundation problems, including cracks and water damage that threatened the integrity of their home. The project aimed to not only repair the damage but also to implement solutions that would prevent future issues.

