New Footing and Slab at Matteson Ave by NE Construction
Los Angeles | May 30, 2024
NE Construction was contracted to address foundation concerns at a property on Matteson Ave, Los Angeles. The project involved the installation of a new footing and slab to enhance the structural integrity of the building.
Completed Date
Project Budget
Project Duration
Installation of new footing and slab to reinforce the foundation and ensure structural stability.
Project Challenges
- Site Preparation: Clearing the existing foundation area and preparing the site for new construction.
- Structural Requirements: Ensuring that the new footing and slab meet all structural standards and regulations.
- Timeline and Budget: Completing the project within the allocated 3-week timeframe and $18,000 budget.
Objectives
- To install a new footing and slab that provide a stable foundation for the building.
- To ensure the new construction meets all relevant building codes and standards.
- To complete the project efficiently within the given budget and timeline.
Results
- Enhanced Stability: The new footing and slab significantly improved the foundation’s stability and load-bearing capacity.
- Compliance Achieved: All construction work met the required building codes and standards, ensuring long-term safety and durability.
- Timely Completion: The project was completed on schedule and within budget, demonstrating NE Construction’s efficiency and expertise.
Solutions & Strategy
Site Preparation:
Conducted a thorough site assessment and cleared the area of debris. Prepared the ground for the installation of new footings and slabs.
Construction Process:
- Footing Installation: Dug and poured new footings to provide a stable base for the slab. Ensured proper alignment and depth as per engineering specifications.
- Slab Pouring: Installed rebar reinforcement and poured the concrete slab, ensuring even distribution and proper curing.
Compliance and Quality Control:
Regular inspections were carried out to ensure that all work met the structural and safety standards. Adjustments were made as necessary to maintain quality.
Budget and Time Management:
Carefully monitored project expenses to stay within the $18,000 budget. Coordinated all activities to complete the project within the 3-week timeframe.
“NE Construction did a fantastic job with our foundation. The team was professional, timely, and stayed within our budget. We now have peace of mind knowing our foundation is solid and secure.”