New Footing and Slab at Matteson Ave by NE Construction

Los Angeles | May 30, 2024

NE Construction was contracted to address foundation concerns at a property on Matteson Ave, Los Angeles. The project involved the installation of a new footing and slab to enhance the structural integrity of the building.

  • Completed Date

    May 30, 2024
  • Project Budget

    $18,000
  • Project Duration

    3 Weeks
  • Installation of new footing and slab to reinforce the foundation and ensure structural stability.

    Project Challenges

    • Site Preparation: Clearing the existing foundation area and preparing the site for new construction.
    • Structural Requirements: Ensuring that the new footing and slab meet all structural standards and regulations.
    • Timeline and Budget: Completing the project within the allocated 3-week timeframe and $18,000 budget.

    Objectives

    • To install a new footing and slab that provide a stable foundation for the building.
    • To ensure the new construction meets all relevant building codes and standards.
    • To complete the project efficiently within the given budget and timeline.

    Results

    • Enhanced Stability: The new footing and slab significantly improved the foundation’s stability and load-bearing capacity.
    • Compliance Achieved: All construction work met the required building codes and standards, ensuring long-term safety and durability.
    • Timely Completion: The project was completed on schedule and within budget, demonstrating NE Construction’s efficiency and expertise.

    Solutions & Strategy

    Site Preparation:

    Conducted a thorough site assessment and cleared the area of debris. Prepared the ground for the installation of new footings and slabs.

    Construction Process:

    • Footing Installation: Dug and poured new footings to provide a stable base for the slab. Ensured proper alignment and depth as per engineering specifications.
    • Slab Pouring: Installed rebar reinforcement and poured the concrete slab, ensuring even distribution and proper curing.

    Compliance and Quality Control:

    Regular inspections were carried out to ensure that all work met the structural and safety standards. Adjustments were made as necessary to maintain quality.

    Budget and Time Management:

    Carefully monitored project expenses to stay within the $18,000 budget. Coordinated all activities to complete the project within the 3-week timeframe.

    “NE Construction did a fantastic job with our foundation. The team was professional, timely, and stayed within our budget. We now have peace of mind knowing our foundation is solid and secure.”