New Foundation and Framing for ADU in Inglewood by NE Construction
Inglewood, CA | September 1, 2024
NE Construction was commissioned to lay the foundation and framing for a new ADU in Inglewood, CA. The homeowner needed a solid and reliable structure to serve as the base for a fully functional ADU. The project’s goal was to establish a strong foundation and framework while adhering to the budget and timeline.
Completed Date
Project Budget
Project Duration
Construction of a new foundation and framing for an Accessory Dwelling Unit (ADU).
Project Challenges
- Tight Timeline: The project required the foundation and framing to be completed within a strict 3-week timeframe.
- Site Preparation: Ensuring the ground was properly prepared and leveled for the foundation installation.
- Structural Integrity: Building a foundation and frame that met safety regulations and could support the full weight of the ADU.
Objectives
- To construct a durable and stable foundation that meets all structural requirements.
- To complete the framing efficiently and accurately, ensuring the ADU’s structure is safe and ready for further development.
- To deliver the project on time and within the $15,000 budget.
Results
- Solid Foundation: Delivered a durable, well-constructed foundation that is ready to support the new ADU.
- Accurate Framing: The framing was completed with precision, providing a strong framework for the ADU’s future build-out.
- On-Time and On-Budget: Successfully completed the foundation and framing within the 3-week timeline and $15,000 budget, showcasing NE Construction’s commitment to efficiency and quality.
Solutions & Strategy
Planning and Preparation:
Conducted a detailed site assessment to determine the best approach for foundation installation. This included preparing the ground for proper leveling and ensuring compliance with local building codes.
Foundation Construction:
- Excavation: Cleared and prepared the site for the foundation installation, ensuring proper depth and alignment for the new structure.
- Concrete Foundation: Laid a reinforced concrete foundation to provide a strong and stable base for the ADU. This included adding rebar for additional strength.
- Inspection: Conducted regular inspections during the foundation process to ensure structural integrity and compliance with all local codes.
Framing:
- Wood Framing: Constructed the ADU’s framework using high-quality wood to ensure stability and longevity. The framing was designed to meet the specific architectural and design needs of the ADU.
- Structural Precision: Ensured all measurements and alignments were accurate to prevent any future issues during the ADU build-out.
Time and Budget Management:
Carefully planned the project to complete both the foundation and framing within the allocated 3-week timeframe. Closely monitored all expenses to ensure the project adhered to the $15,000 budget.
“NE Construction did an excellent job on the foundation and framing for our new ADU. Their team was efficient, professional, and delivered exactly what we needed, on time and within our budget. We’re excited to continue building our ADU, knowing we have a solid foundation to build on.”