New Foundation for ADU Garage Conversion in East Los Angeles
East Los Angeles, CA | December 27, 2024
NE Construction was hired to lay the foundation for a 2-car garage conversion into an ADU in East Los Angeles. The homeowner required a durable, high-quality foundation to serve as the base for the ADU, ensuring structural integrity and compliance with local building regulations. The project needed to be completed efficiently to allow the main construction to move forward on schedule.
![](https://neconstructiondesign.com/wp-content/uploads/WhatsApp-Image-2024-12-18-at-19.26.39-1-1024x768.jpeg)
Completed Date
Project Budget
Project Duration
Construction of a new foundation for a 2-car garage being converted into an Accessory Dwelling Unit (ADU).
Project Challenges
- Quick Turnaround: Completing the foundation within a strict 2-week timeframe.
- Structural Requirements: Meeting all structural and safety standards while ensuring a smooth base for the ADU.
- Budget Adherence: Delivering quality results within the $28,000 budget.
Objectives
- To construct a durable and stable foundation that meets the requirements for a garage-to-ADU conversion.
- To complete the project on time and within budget while adhering to local building codes.
- To provide a solid base that ensures the longevity and safety of the ADU.
Results
- High-Quality Foundation: The new foundation provides a durable, stable base for the ADU, ensuring structural integrity and compliance with building codes.
- Efficient Turnaround: Completed the project in just two weeks, allowing the next phase of construction to proceed on schedule.
- Budget-Friendly: Delivered the project within the $28,000 budget without compromising on quality.
Solutions & Strategy
Site Preparation:
- Cleared and leveled the existing site to prepare for foundation construction.
- Conducted a thorough inspection of the soil and garage structure to ensure readiness for the new foundation.
Foundation Construction:
- Excavation: Dug the site to the required depth, ensuring proper grading for stability and drainage.
- Reinforced Concrete: Poured a reinforced concrete foundation with rebar for additional strength and longevity.
- Precision Work: Ensured the foundation was leveled and aligned perfectly to support the ADU’s framing and build-out.
Compliance and Quality Control:
- Followed all local building codes and guidelines for ADU construction.
- Conducted inspections at every stage of the foundation process to ensure safety and quality standards were met.
Time and Budget Management:
Maintained close coordination with the client and construction team to complete the project within the 2-week timeframe. Sourced high-quality materials that fit the $28,000 budget.
“NE Construction exceeded our expectations with their efficiency and quality. The foundation for our ADU was completed on time, on budget, and looks fantastic. We’re excited to see the rest of the project come together!”