Ground-Up ADU Construction in Los Angeles

Los Angeles |

NE Construction & Design built this Los Angeles accessory dwelling unit from the ground up in six months. The gallery follows the build from wood framing through drywall installation to a finished bathroom detail.

Wood framing for a ground-up accessory dwelling unit in Los Angeles
  • Completed Date

  • Project Budget

    Not disclosed
  • Project Duration

    6 months
  • Ground-up accessory dwelling unit construction

    Project Challenges

    A new ADU needs its own footprint and structure. Once framing is up, wall openings, ceiling geometry and fixture locations are easier to see and harder to change without rework.

    Objectives

    Create a new living space with a structure and interior laid out for everyday use.

    Results

    The finished detail illustrates how early layout and framing decisions carry through to the final room. Compare the build sequence with the tall roofline and completed exterior in the Santa Monica detached ADU.

    Planning a similar project? Talk with NE Construction & Design about your property or explore more completed work.

    Compare detached builds and garage conversions on our Los Angeles ADU construction page.

    Solutions & Strategy

    The framing photo shows the wall and window openings before they were covered. The drywall photo shows the interior taking shape, including the ceiling planes. The finished bathroom photo shows the last stage, with the sink and wall-mounted faucet installed.